– Location: Baghdad – Al.Mahmodiyah
– Client : USA army – 2nd BCT- 10th Mountain Division
– Start & Finish Date: Sep. / 2006 – Oct./ 2006
– Contract amount: 1.232.750 USD

Project Summary:
Paving with asphalt of (1750 meter) long, (7 m) wide in Al-Mahmodiyah next to the railway. The work included sub grade scraping and compaction sub-base 25 cm thick layer spreading and compaction, paving with stabilizer layer (asphalt) 7 cm thick, According to Iraqi bridges and roads standards, and marking of the road.