– Location: Baghdad – Al.Mahmodiyah
– Client : USA army – 2nd BCT10th Mountain Division
– Start & Finish Date: Sep. / 2006 –Oct./ 2006
– Contract amount: 1.600.000 USD

Project Summary:
Paving with asphalt (750 meter) long, (7 m) wide street in Al-Mahmodiyah. The work included sub grade scraping and compaction sub-base( 25 cm ) thick layer spreading and compaction, and paving with stabilizer layer (asphalt) 7 cm thick, According to Iraqi bridges and roads standards.