Project Summary: Paving with asphalt (750 meter) long, (7 m) wide street in Al-Mahmodiyah. The work included sub grade scraping and compaction sub-base( 25 cm ) thick layer spreading and compaction, and paving with stabilizer layer (asphalt) 7 cm thick, According to Iraqi bridges and roads standards.