+9647734444333 info@janaenwasset.com

– Location: Baghdad / Al.Mahmodiyah
– Client : USA army _2nd BCT- 10th Mountain Division
– Start & Finish Date: Aug./ 2007 – Sep./ 2007
– Contract amount : 168.000 US Dollar.


Project Summary:
Painting & cleaning of the tank internal side with an Epoxy food paint as well as an external resistant water paint, replacing filing tank system (piping, mechanical floats, locks (700mm), maintaining the pipes (700mm) in addition to wiring & connecting electrical system and warning lights, constructing, plastering and painting a wall surrounding the tank (100m) long, and installing a gate for fence.

Close Menu